EDP, requested specifically by the client, has a history of undertaking complex audits with marine vessels in the Brisbane market.
Work included a pre-demolition audit of two large tug boats that had spent six months on the ocean floor off Hobart after a double crash. On completion of the audit, EDP was engaged to complete all air monitoring and visual clearance works during the required asbestos removal. The removal comprised both bonded and friable asbestos, as well as further sampling during removal as additional locations were uncovered during demolition.